Phase A (Plant 1)
September 2019
-
Construction Site
-
Construction Site
-
Storm Pond 2 - Footings for Retaining Wall Installation
-
Plant 1 Storm Pond Number 2 - Increasing wall height for more detention volume
-
Plant 1 disinfection building
-
Plant 1 Vactor pad
-
Vactor pad draining
-
Sludge Drying Canopy Demolition
-
Disinfection Building - Pre-Foundation Plumbing and Electrical
-
Disinfection Building - Pre-Foundation Plumbing and Electrical
-
Disinfection Building - Pre-Foundation Plumbing and Electrical
-
Storm Pond Number 2 Raised Wall Forms
-
Storm Pond Number 2 Raised Wall Forming
-
Storm Pond Number 2 Concrete Wall Pour
-
30-inch Effluent Line Bore
-
30-inch Effluent Line Bore
October 2019
-
30-inch Effluent Line Bore
-
Storm Pond Number 2 Walls
-
Storm Pond Number 2 Walls
-
Storm Pond Number 2 Wall Concrete Pour
-
Storm Pond Number 2 Wall Concrete Pour
-
Storm Pond Number 2 Wall Concrete Pour
-
30-inch Effluent Line Piping
-
30-inch Effluent Line Bore
-
30-inch Effluent Line Bore Machine
-
Sludge Drying Canopy Roof Removal
-
Storm Pond Number 2 Wall Forms
-
Storm Pond Number 2 Wall Forms
November 2019
-
Disinfection Building
-
Disinfection Building
-
Sludge Drying Canopy Roof Removal
-
Storm Pond Number 2 Walls
-
Storm Pond Number 2 Walls
-
Sludge Drying Canopy Demolition
-
Sludge Drying Canopy Pipe Removal
-
30-inch Effluent Line Bore
-
Sludge Drying Canopy Push Wall Forms
December 2019
-
Storm Pond Number 1 Demolition
-
Storm Pond Number 1 Demolition
-
Sludge Drying Canopy Roof Rebuild
-
Sludge Drying Canopy Roof Rebuild
-
Disinfection Building Wall Masonry
-
Storm Pond Number 1 Demolition
-
Storm Pond Number 1 Demolition
-
Storm Pond Number 2 Walls Finished
-
Storm Pond Number 2 Walls Finished
-
Storm Pond Number 1 Demolition
-
Storm Pond Number 2 Inlet and Outlet Structure
-
Sludge Drying Canopy Roof Rehab
-
Storm Pond Number 1 Wall Forms
-
Sludge Drying Canopy Roof Rehab
-
Old Damaged Pipe Removal
-
Disinfection Building Wall Masonry
-
Disinfection Building Wall Masonry
-
New 6-inch Water Line
-
New 6-inch Water Line
-
Storm Pond Number 2 Inlet-Outlet structure with grading complete
-
Storm Pond Number 2 final grading
-
Sludge Storage Canopy Push Wall
-
Storm Pond Number 1 Raised Walls Forming
-
Storm Pond Number 1 Raised Walls Forming
-
Disinfection Building Wall Masonry
-
Storm Pond Number 1 Wall Raise Poured
-
Storm Pond Number 1 Inlet Structure Framing
-
Sludge Storage Canopy Roof Rehab
-
Storm Pond Number 2 Final Grading
-
Disinfection Building Roof Trusses Installation
-
Storm Pond Number 1 and Number 2 Inlet and Outlet Piping
-
Storm Pond Number 1 Inlet Structure
-
Storm Pond Number 1 Outfall Structure
January 2020
-
Storm Pond Number 1 Outlet Structure
-
Disinfection Building Roof
-
Storm Pond Number 1 Inlet Piping
-
Storm Pond Number 1 Inlet Piping
-
Sludge Drying Canopy Concrete Floor Pour
-
Storm Pond Number 1 Walls and Inlet Structure
-
Storm Pond Number 1 Discharge Structure Framing
-
Storm Pond Number 1 Discharge Structure Framing
-
Storm Pond Number 1 Inlet Lines
-
Disinfection Building Interior
February 2020
-
New Blower Building Excavation
-
Storm Turbine Pump being sent for rehabilitation
-
Blower Building Excavation
-
Storm Pond No 1 Final Wall Sections
-
Storm Pond No 1 Discharge Structure
-
Bypass lines between Storm Ponds No 1 and No 2
-
Parts being stockpiled in renovated Sludge Storage Canopy
-
Sludge Storage Canopy Roof
March 2020
-
Sludge Storage Canopy Roof
-
Storm Pond Number 1 completed walls
-
Blower building wall forming
-
Blower building floor slab poured
-
Disinfection building containment area
-
Finished sludge drying canopy roof
-
Storm pump removal and rehabilitation
-
Storm pump removal and rehabilitation
-
Blower building suspended slab poured
-
Siding and Roofing of disinfection building
-
Sheet piling installed for pump station excavation
-
Main control building lab demolition
-
Siding and roofing disinfection building
April 2020
-
Storm Pond No 1 Final Grading
-
Refurbished Vertical Turbine Storm Pump Installation
-
Refurbished Vertical Turbine Storm Pump Installed and Connected
-
Influent Pump Station Excavation
-
Storm Pond No 1 Base Slab
-
Influent Pump Station Iron Work for Walls
-
Storm Pond No 1 Slanted Wall Concrete
-
Disinfection Building Roofed and Sided
-
Storm Pond No 1 Concrete
-
Main Control Building Lab Demolition
-
Main Control Building Office Demolition
May 2020
No photos were taken in May.
June 2020
-
Blower Building Finished Masonry and Roof Installation
-
Storm Pond No 1 75 Percent Complete
-
Demolition and Framing for the Addition to the Main Control Building
-
Influent Pump Station with Completed Top
-
Excavating and Demo Work for Bar Screen Addition
-
New Electrical Conduit Duct Banks Leading to Main Control Building
-
Interior of Blower Building Painted
-
Main Control Building Demolition
-
Main Control Building Addition
-
Main Control Building Roof Replacement
-
Main Control Building Roof Demolition
-
Storm Pond No. 1
-
Main Control Building Roof Replacement
-
Storm Pond No. 1 Finished
-
Storm Pond No. 1 Finished
-
Storm Pond No. 1 Finished
-
Storm Pond No. 2 Grading for Base Slab
-
Main Control Building Rehab
-
Main Control Building Rehab
-
Storm Pond No. 2 Rebar for Base Slab
-
Blower Building Main Control Panels
July 2020
-
Storm Pond No 2 Base Slab and Slope Concrete
-
Storm Pond No 2 Base Slab and Slope Concrete
-
Disinfection Building Chemical Storage
-
Blower Building Air Header
-
Generator Pad
-
Storm Pond No 2 Base Slab and Slope Concrete
-
Storm Pond No 2 Base Slab and Slope Concrete
-
Blower Building Air Header
-
Headworks Building Bar Screen Channel Addition
-
Main Control Building Demolition
-
New 24-inch Pipe to Influent Pump Station
-
14 - Storm Pond No 1 in Service After Heavy Rain
-
Main Control Building Demolition
-
New 24-inch Pipe to Influent Pump Station
-
Headworks Bar Screen Channel Extension
August 2020
-
Storm Pond Number 2 Base Slab and Slope Concrete
-
Blower Building Basement Non-Potable System